Industrial Boiler Flue Gas Recovery Case Study

Views: 3     Author: Site Editor     Publish Time: 2024-07-15      Origin: Site


Industrial Boiler Flue Gas Recovery Case Study


Problem: Significant waste heat loss through boiler flue gases.

Solution: Install a finned tube heat exchanger to recover heat from flue gases and preheat feedwater.

Results:

Efficiency Improvement: Increased boiler efficiency by 10%.

Cost Savings: Reduced fuel consumption, leading to annual savings of $50,000.

Environmental Impact: Reduced CO2 emissions by 200 tons per year.


Industries and facilities can achieve significant energy savings, operational cost reductions, and environmental benefits by incorporating finned tube heat exchangers into heat recovery systems.


Industrial Boiler Flue Gas Recovery Case Study


PHONE

International Business:+86 0519 8878 2189

Domestic business:+86 0519 8878 2190

QUICK LINKS

PRODUCTS

ABOUT US

When it comes to building heat exchanger for any application VRCOOLERTECH has the capability to meet your requirements.
Copyright © 2021 Changzhou Vrcoolertech Refrigeration Co.,Ltd All rights reserved.  Sitemap  Manage Entrance